银川经济技术开发区距银川火车站约6公里,河东机场25公里。水、电、气、暖供应充足,日供水量5万吨,日处理污水能力5万吨,建有2座110KV变电所,天然气末站和民用天然气储配站年供气量4亿立方米,建有容量为2×200MW热电厂,供热面积达2200万平方米,可满足企业的建筑采暖和工业蒸汽需求。
YETDZ is situated in an advantageous location coordinated with ecological and residential environment, the beautiful investment surroundings, well-equipped basic facilities and perfect service system. It is 12 km from Administrative Center, 6km from Yichuan Railway Station and 25km from Hedong Airport. It has the capacity of water supply 50,000 tons and sewage treatment 50,000 tons per day. The total heat area in the zone is 22 million m2 and the annual gas supply is 4 billion m3, meanwhile Xixia Thermal Power Co. Ltd(2×200MW) can satisfy the needs for the surrounding enterprises.